Track construction
All our machines are frequently tested before delivery. From now on, we will do that on our own piece of test track, right next to our office. This piece of track is equipped with a 50-meter curve, a switch and a superelevation. This allows us to simulate the different situations on the track and we can be sure that the machine can be used on all types of track.